Chubbuck Wastewater Collection System Facilities Plan - Chubbuck, ID

J U B performed a wastewater collection system facilities plan for the City of Chubbuck service area encompassing approximately 16 square miles with a planning population of over 60,000 people.


City of Nampa Collection System Master Plan - Nampa, ID

J-U-B recently updated the sewer master plan for the City of Nampa. The master plan update included developing a GIS based hydraulic model to evaluate the existing system and layout of future sewer trunks for an additional 45 square miles. In total, 110 square miles of area was modeled and master planned.


Meridian Downtown Sewer Study - Meridian, ID

J-U-B recently assisted the City of Meridian with a Downtown Sewer Study to gain a comprehensive understanding of how proposed redevelopment will affect sewers in the downtown core.


Meridian Sewer Master Plan Update - Meridian, ID

J-U-B has been involved with the Meridian sewer master plan since 1996 and as a company since the 1970s.


Santaquin Water Reclamation Facility - Santaquin, UT

With help from J-U-B, Santaquin City developed a Wastewater Facility Master Plan. The Master Plan indicated that Santaquin’s existing lagoons and effluent disposal facilities were at capacity.


Filer Wastewater Master Plan and Treatment Plant Design and Construction - Filer, ID

The City of Filer hired J-U-B to provide wastewater treatment facilities planning, design, surveying, and construction engineering services due to concerns regarding future population growth and compliance with their NPDES and Reuse Permits.


Buhl Wastewater Master Plan and Treatment Plant Design - Buhl, ID

J-U-B developed a Wastewater Facility Plan to evaluate various treatment options for the City of Buhl, Idaho.


Post Falls Wastewater Treatment Plant Improvements - Post Falls, ID

Rapid regional growth and strict discharge requirements required careful system-wide Master Planning and numerous upgrades of the Post Falls Wastewater Treatment Plant.


Lewiston Wastewater Collection and Treatment Master Plan - Lewiston, UT

Lewiston’s existing lagoon system discharges into the Cub River. The lagoon effluent could not reliably and consistently meet State discharge requirements. The City wanted to better understand its needs and study potential improvements to the treatment facilities as well as its flow monitoring system.


Coalville Wastewater Facility Plan and Update - Coalville, UT

In 2006, J-U-B developed a wastewater treatment capital facility plan for Coalville City. The facility plan considered a number of city concerns including: growth and a need to update impact fees, phosphorus TMDL on Echo Reservoir, aging infrastructure, existing plant property boundary with a very small footprint, potential for odor complaints from nearby residences, and long term solids handling needs.