Comprehensive Center Street Improvements for Logan City
Logan City hired J-U-B’s Transportation Services Group (TSG) to design major improvements along Center Street from US-89/91 (Main Street) to 100 West. A key component of the project was the installation of a new signal system at the intersection of Center Street and 100 West to improve safety and traffic flow.
Project Scope and Multidisciplinary Design Features
The project consisted of a complete roadway reconstruction from building face to building face and included:
-
Sidewalk widening to enhance pedestrian accessibility
-
Drainage and irrigation system improvements
-
Upgraded lighting and new signal design
-
Design of gathering plazas and landscape beautification
-
Addition of site amenities such as planter boxes and decorative pots
Collaborative Coordination and Stakeholder Engagement
The project also required coordination with a wide range of stakeholders, including:
-
Downtown businesses to discuss and mitigate project impacts
-
Structural engineers for the design of an overhead archway
-
Electrical engineers for enhanced lighting and power systems
-
Landscape architects for integrated beautification features
-
Utility companies for necessary relocations
-
UDOT for work related to the Main Street (US-89/91) intersection