Gateway Mapping The Langdon Group J-U-B Engineers

VISIT THE FAMILY OF J-U-B COMPANIES

 Projects

Our Projects

Area of Expertise:
Project Type:

Go

Projects

Logan Fisheries Experiment Station-Phase 2 Raceway Reconstruction Project

Client: State of Utah Division of Wildlife Resources - Logan, Utah

Overview

J-U-B prepared the design for 300 linear feet of concrete raceway to rear approximately 40,000 pounds of rainbow trout and other species.  The project included demolition of the existing raceways and a settling basin, reconstruction of a new settling pond, design of a lift station and layout and design of the site for future expansion raceways.  The design of the raceways and settling basin has been adopted by the Division of Wildlife Resources as their standard for future construction projects.

This project included:

  • Functioning as the Prime Consultant
  • Aquaculture
  • Water Treatment
  • Structural Design
  • Civil Design
  • Construction Observation