Hanford 100N Water Treatment Plant

Client: Bechtel Hanford, Inc. – Benton County, WA

Overview

J-U-B ENGINEERS, Inc. teamed with a general contractor, Thompson Mechanical, to provide design/build service for a new water treatment plant and system upgrade, which provides potable water to workers demolishing an abandoned nuclear reactor at the Hanford 100N Site.

The system capacity was 50 gpm. The project was designed and completed to meet stringent federal requirements and a fast-track schedule.

This project included:  

  • A cartridge/bag filtration treatment skid with liquid hypochlorine injection
  • A large diameter HDPE pipe section to provide contact time for disinfection
  • A 10,000 gallon storage tank (included for potable water storage