2003 City of Kennewick Booster Stations - Kennewick, WA
Client: City of Kennewick,WA
Overview
The City of Kennewick hired J-U-B ENGINEERS, Inc. for their 2003 Booster Stations project. J-U-B provided design and construction engineering services to construct a new 3.5 mgd booster station at 46th/Olson and to replace a 3.5 mgd booster station at 28th/Irving and a 5.0 mgd booster station at 18th/Kellogg. The project included WaterCAD computer modeling to develop system curves for the pump design and pipe sizing. Also, each station included onsite hypochlorine generation systems.