The Spokane County Engineers Department contracted J-U-B to delineate two wetlands for the purpose of designing wetland enhancements for replacement mitigation.
J-U-B wetland biologists assisted the Port of Benton with their environmental process needs.
Salt Lake County hired J-U-B Engineers to develop bank stabilization measures along the east side of the Jordan River from 7800 South to Winchester Street (approx. 6400 S.).
The largest cemetery West of the Mississippi, The Salt Lake Cemetery was in need of a more accurate map of the cemetery. A lot of people wanted to know who was buried at the cemetery and where people were buried.
The Salt Lake County needed a better way to track the regular maintenance of traffic signals and street lights.
The Americans with Disability Act requires that local governments build curb ramps to be accessible to people with disabilities.
This project began as a study and developed into the full design and construction of a city-wide pressure irrigation system.
This project provides pressure irrigation to the approximately 40,000-acre service area of the Davis and Weber Counties Canal Company.
J-U-B has been working with the Eden Valley Irrigation and Drainage District (Wyoming) to master plan, secure salinity reduction program funding for, and design a district-wide piped irrigation system.
This project included the preparation of design and construction plans, specifications and contract documents for the Happy Valley Pressure Irrigation Well and Pump Station for the City of Nampa, ID.